O
Port Chester
← Port Chester

Port Chester · issues

Civic issues

Topics getting the most attention in Port Chester public meetings, ranked by how frequently they come up.

15 issues (filtered)14 topics
HighDevelopment

Costco expansion at 1 Westchester Avenue

Costco wants to square off its building's southeast corner with a ~7,000-square-foot addition housing new escalators and moving bottle return inside, adding some retail space. The village wants renderings, lighting/landscaping plans, and stormwater details before a public hearing.

17 mentions (1 this month)Last discussed Oct 26, 2026
HighDevelopment

Site plan deadline extensions for stalled projects (Portview, 155 Irving, 157 Westchester)

Neighbors say the vacant, boarded-up buildings are overgrown, smelly, and attracting loitering, and that pedestrians walking to the train are nearly hit by the sloppy one-way setup. The board is withholding the extension vote until the developer visibly cleans up the properties by November 2.

3 mentions (1 this month)Last discussed Oct 19, 2026
HighDevelopment

Westchester Crossing (United Hospital site) redevelopment approvals

The IDA upgraded the hotel's tax break from 15 to 20 years and assigned benefits to RMS Companies. Supporters say the enhanced term is needed to make the risky boutique hotel viable and bring jobs and visitors downtown.

13 mentions (2 this month)Last discussed Oct 14, 2026
HighDevelopment

Truck traffic and sidewalk safety at 21 Grace Church Street coffee plant

The coffee plant's 48- and 53-foot trucks block sidewalks and snarl traffic on Grace Church Street. The commission is crafting conditions — northern dock only, off-peak delivery windows, decoupling, and flaggers — to let the business survive without endangering pedestrians.

3 mentionsLast discussed Sep 28, 2026
HighDevelopment

Building department staffing and permit delays

Leaders of the Longview co-op told the board their $6.5 million capital project has been stalled about two years because the building department is overwhelmed by big developments and can't review paperwork or do inspections in time. The village manager promised to follow up the next morning.

3 mentionsLast discussed Sep 8, 2026
HighDevelopment

Embassy Equity Partners tax incentives for 128 North Main Street

A 250-unit, 8-story building with 25 affordable apartments, ground-floor retail and 125 public parking spaces is moving through the IDA process. The developers are spending about $8.2 million on the public parking portion and paying roughly $3.15 million in mitigation fees. Construction could start early next year and finish by mid-2029.

4 mentionsLast discussed Aug 19, 2026
HighDevelopment

Embassy application delays and July 22 special meeting

A full-block, eight-story project with 250 apartments (25 affordable), 80,700 square feet of retail, and 125 public parking spaces would replace seven aging buildings. Longtime small business tenants worry about displacement and relocation costs.

2 mentionsLast discussed Jul 8, 2026
HighDevelopment

250 Boston Post Road development and construction impacts

Neighbors near JFK School pushed hard on construction traffic, 20-26 foot excavation next to homes, noise monitoring, and drainage. The commission added conditions on landscaping verification and locked the rear Smith Street gate to emergency use only after construction.

6 mentionsLast discussed Jul 6, 2026
HighDevelopment

30 Broad Street redevelopment completion

The long-troubled 30 Broad project is weeks from a temporary certificate of occupancy, with a brewery restaurant and event space coming. It's expected to bring visitors and jobs downtown.

1 mentionLast discussed Jun 10, 2026
HighDevelopment

Embassy Project tenant displacement and relocation

Ten occupied commercial tenants and eight residential households face displacement. The Provenza restaurant owners asked for written commitments and financial help; the developer is offering relocation assistance but only three commercial tenants want to return.

9 mentionsLast discussed May 27, 2026
HighDevelopment

250 Boston Post Road apartment development variances

The former TD Bank site is headed toward 120 apartments, including 10% affordable units, with five stories where zoning allows three. The board found the topography — rock outcroppings and a 40-foot rise toward the school — justified the variances without blasting or neighborhood harm.

1 mentionLast discussed Apr 16, 2026
HighDevelopment

120-unit apartment proposal at 250 Boston Post Road

The developer of the former TD Bank site wants variances to build 120 apartments (10% affordable) with four stories of residential over three stories of parking — two stories over the zoning cap. The case keeps getting pushed while the Planning Commission reviews a revised plan.

3 mentionsLast discussed Apr 16, 2026
HighDevelopment

Embassy Project redevelopment of North Main Street

A 250-unit building with ground-floor retail and public parking is moving through review. New renderings show brick detailing, balconies, and a restored historic Embassy sign in the lobby. A public hearing is set for January 26.

2 mentionsLast discussed Mar 30, 2026
HighDevelopment

Embassy Theater project public parking MOU

The Embassy project will include 125 public parking spaces downtown, with the Village getting a 35% share of parking revenue. The IDA got an early heads-up because the public benefit is large enough to require a special deviation from its usual rules.

2 mentionsLast discussed Mar 11, 2026
HighDevelopment

120-Unit Residential Development at 250 Boston Post Road

The first residential project proposed for the Boston Post Road corridor would put 120 apartments above a three-level parking garage. The applicant trimmed its variance requests from many down to two after months of Planning Commission review, and neighbors' concerns about views and construction noise drove design changes.

1 mentionLast discussed Feb 19, 2026