Residential parking, traffic circulation, and public safety study (RFP 2026-07)

The Village planned to hire a consultant to study parking and traffic in the Edison/Brooksville/downtown area — how many spaces exist, how they're used day and night, and whether emergency vehicles and pedestrians can move safely. Findings could eventually change parking rules and street design.

5 mentions (2 this month)Last discussed Oct 28, 2026
HighPublic Safety

E-bike and scooter safety

The Mayor and a trustee wanted the board to talk about e-bike and scooter safety around the Village. This could lead to new rules or enforcement affecting riders and pedestrians.

3 mentions (2 this month)Last discussed Oct 28, 2026
HighTaxes Budget

Outstanding parking ticket collection IMA with Town of Rye

The board was due an update on the agreement with the Town of Rye for collecting unpaid parking tickets. Unpaid fines mean lost revenue for the Village.

4 mentions (2 this month)Last discussed Oct 28, 2026
HighParks Recreation↑Rising

Graduated parking fines local law

A proposed local law would set graduated fines for overnight parking and street cleaning violations, with minimum fines for other parking violations. A public hearing was to be scheduled before any adoption.

5 mentions (3 this month)Last discussed Oct 28, 2026
HighDevelopment

Costco expansion at 1 Westchester Avenue

Costco wants to square off its building's southeast corner with a ~7,000-square-foot addition housing new escalators and moving bottle return inside, adding some retail space. The village wants renderings, lighting/landscaping plans, and stormwater details before a public hearing.

17 mentions (1 this month)Last discussed Oct 26, 2026
HighInfrastructure

Waterfront bulkhead sinkhole

A 16-foot void was found behind the 1991 steel sheet-pile bulkhead at the waterfront. Divers will inspect the river side this week; the waterfront opening could be delayed and remaining bulkhead capital funds may be redirected to the repair.

1 mention (1 this month)Last discussed Oct 19, 2026
HighDevelopment

Site plan deadline extensions for stalled projects (Portview, 155 Irving, 157 Westchester)

Neighbors say the vacant, boarded-up buildings are overgrown, smelly, and attracting loitering, and that pedestrians walking to the train are nearly hit by the sloppy one-way setup. The board is withholding the extension vote until the developer visibly cleans up the properties by November 2.

3 mentions (1 this month)Last discussed Oct 19, 2026
HighRoads

Westchester and Bowman Avenue intersection safety

Paving bids are out and due June 18, with award expected in July. Viola committed in writing to resurface the Hawley Avenue side streets by July 31. The county is re-reviewing the village's Complete Streets application for a Bowman Avenue traffic light after three recent crashes there.

2 mentions (1 this month)Last discussed Oct 19, 2026
HighWater Utilities

Putnam Avenue sewer project grant award

The village is fixing storm sewer problems on Locust Avenue with a $75,000 capital project and a $65,500 construction award to Legacy Supply LLC.

3 mentions (1 this month)Last discussed Oct 19, 2026
HighBusiness Jobs

Port & Main job shortfall

Port & Main is still well behind on promised jobs even after being given breathing room. The board will meet with the developer and may trigger its new employment verification policy.

2 mentions (1 this month)Last discussed Oct 14, 2026
HighDevelopment

Westchester Crossing (United Hospital site) redevelopment approvals

The IDA upgraded the hotel's tax break from 15 to 20 years and assigned benefits to RMS Companies. Supporters say the enhanced term is needed to make the risky boutique hotel viable and bring jobs and visitors downtown.

13 mentions (2 this month)Last discussed Oct 14, 2026
HighZoning

Comprehensive plan progress

The second public workshop drew decent attendance and mostly positive feedback; a draft plan is expected by year-end with possible Board of Trustees action as soon as February.

5 mentions (1 this month)Last discussed Oct 14, 2026
HighBusiness Jobs

Commercial displacement mitigation study

The LDC is drafting an RFP to hire a consultant to study how well the village handles commercial displacement — businesses being pushed out — and recommend proactive policies, possibly including spending money to help developers mitigate displacement.

2 mentions (1 this month)Last discussed Oct 14, 2026
HighBusiness Jobs

Non-Profit Grant Program launch

The LDC is preparing a financial-assistance application for local nonprofits, with a pilot round of grants planned. Board members want a flexible process because many small nonprofits lack the capacity to compete through complicated applications.

2 mentions (1 this month)Last discussed Oct 14, 2026
HighPublic Safety

Response to Rumors About First Responders in Mr. Panella Fatality

The mayor and village leaders publicly pushed back on social media rumors falsely blaming police, fire, and EMS for a local man's death in a March accident. The mayor, visibly angry, called the commenters 'faceless cowards' and defended the responders' work.

6 mentions (1 this month)Last discussed Oct 5, 2026
HighZoning

Moratorium debate and legal authority to change the code

Resident Jim Brill again pushed a temporary pause on big downtown projects, arguing 3,600 units are already in the pipeline versus the 2,900 the code projected over 20 years. Trustee Allen sympathized but said attorneys call the legal bar for a moratorium as high as for the zoning changes themselves.

3 mentionsLast discussed Sep 30, 2026
HighZoning

Building heights and form-based code reform (CD-5, CD-6, CD-6T)

Trustee Allen wants to downzone parts of the downtown now, two years after the CD 5-6 committee recommended it, to stop 12-story towers from rising in residential neighborhoods. Others want to wait for the comprehensive plan due as soon as November. No decision was made.

3 mentionsLast discussed Sep 30, 2026
HighEnvironment

Village-wide flood study

Both big cases touched flooding: the Main Street project is seeking a FEMA letter of map revision, and the Grace Church proposal raised runoff concerns. Commissioners pressed for assurances that neither project makes flooding worse.

2 mentionsLast discussed Sep 30, 2026
HighDevelopment

Truck traffic and sidewalk safety at 21 Grace Church Street coffee plant

The coffee plant's 48- and 53-foot trucks block sidewalks and snarl traffic on Grace Church Street. The commission is crafting conditions — northern dock only, off-peak delivery windows, decoupling, and flaggers — to let the business survive without endangering pedestrians.

3 mentionsLast discussed Sep 28, 2026
HighZoning

Future of the CD-6T transit-oriented district

Several trustees want to eliminate the CD-6T district — the two blocks near the train station where 15-story buildings are allowed — arguing it was ill-advised and is mostly built out anyway. Others say there's little left to change there and the effort should focus on CD-6 and CD-5.

1 mentionLast discussed Sep 23, 2026
HighBudget

FY 2026-2027 PCIDA budget

The agency is sitting on roughly $3 million but spends far more on compliance monitoring than it collects in fees. Board leaders want to study setting aside (restricting) part of that fund balance to guarantee it can administer 20-year PILOT deals even if no new projects close.

4 mentions (2 this month)Last discussed Sep 9, 2026
HighDevelopment

Building department staffing and permit delays

Leaders of the Longview co-op told the board their $6.5 million capital project has been stalled about two years because the building department is overwhelmed by big developments and can't review paperwork or do inspections in time. The village manager promised to follow up the next morning.

3 mentionsLast discussed Sep 8, 2026
HighPublic Safety

Rumor that police work with ICE

Trustees forcefully debunked a rumor that Port Chester police act as ICE bounty hunters. The mayor and Trustee Naulaguair discussed posting a public police statement to reassure the Hispanic community.

3 mentionsLast discussed Sep 8, 2026
HighDevelopment

Embassy Equity Partners tax incentives for 128 North Main Street

A 250-unit, 8-story building with 25 affordable apartments, ground-floor retail and 125 public parking spaces is moving through the IDA process. The developers are spending about $8.2 million on the public parking portion and paying roughly $3.15 million in mitigation fees. Construction could start early next year and finish by mid-2029.

4 mentionsLast discussed Aug 19, 2026
HighWater Utilities

Glen Avenue / North Regent Street stormwater project

Major drainage work is underway to keep stormwater out of basements in the low-lying parts of the village; recent street flooding was explained by a temporary construction dam, and restoration of Davenport Circle is expected by year's end.

1 mentionLast discussed Jul 29, 2026
HighParks Rec

Waterfront improvements — loop, swings, shuffleboard and stage

The board funded the $4.93 million final waterfront phase and first loop segment — new stamped, dyed sidewalks, curbs, ADA ramps and crosswalks from the waterfront up Willard Avenue to North Main Street — reconnecting the Mariner, Capitol Theatre and waterfront. About 90% is grant-funded.

2 mentionsLast discussed Jul 29, 2026
HighRoads

Truck traffic and sidewalk blocking on Grace Church Street

The coffee roaster expansion would bring more 53-foot trucks to a street where they already block traffic and sidewalks. Commissioners want an updated truck-turning study, possible delivery-hour restrictions, and ideas like decoupling tractors from trailers before any approval.

2 mentionsLast discussed Jul 27, 2026
HighPublic Safety

Overcrowding and absentee landlord enforcement at 7 Leonard Street

The board wrestled with approving a renovation for a landlord with a history of overcrowding violations, debating whether more bedrooms invite more overcrowding — and concluding there's no practical way to enforce occupancy limits in two-family rentals.

1 mentionLast discussed Jul 16, 2026
HighDevelopment

Embassy application delays and July 22 special meeting

A full-block, eight-story project with 250 apartments (25 affordable), 80,700 square feet of retail, and 125 public parking spaces would replace seven aging buildings. Longtime small business tenants worry about displacement and relocation costs.

2 mentionsLast discussed Jul 8, 2026
HighRoads

Downtown public infrastructure partnership (Liberty Square, MTA underpasses, Summerfield Park)

The chairman wants to revive the IDA's old Liberty Square commitment and possibly help fund the village manager's plan to spruce up the railroad underpasses with lighting, landscaping and seating. The board was receptive; the village manager will bring back renderings and costs after MTA sign-off.

2 mentionsLast discussed Jul 8, 2026
HighDevelopment

250 Boston Post Road development and construction impacts

Neighbors near JFK School pushed hard on construction traffic, 20-26 foot excavation next to homes, noise monitoring, and drainage. The commission added conditions on landscaping verification and locked the rear Smith Street gate to emergency use only after construction.

6 mentionsLast discussed Jul 6, 2026
HighRoads

Road paving and county/state street maintenance

The village blasted the state over crumbling state roads — South Main Street, Westchester Avenue, Boston Post Road — even getting News 12 coverage. The village fills potholes itself but says the state must fund repairs on roads it owns.

4 mentionsLast discussed Jul 6, 2026
HighRoads

Illegal crosswalk on South Main Street (Route 1)

A crosswalk at Boston Post Road and Brody Way was approved temporarily during construction but never made permanent by the state — and it has no ADA ramp. Trustee Ford wants the village to demand the state remove it before someone gets hurt; the board agreed to send a letter.

1 mentionLast discussed Jun 15, 2026
HighBusiness Jobs

Job creation compliance at 16-18 North Main Street

The developer hasn't found a commercial tenant for its vacant space, leaving it short on promised jobs. The IDA is formally putting the developer on notice and may consider recapture remedies.

5 mentionsLast discussed Jun 10, 2026
HighDevelopment

30 Broad Street redevelopment completion

The long-troubled 30 Broad project is weeks from a temporary certificate of occupancy, with a brewery restaurant and event space coming. It's expected to bring visitors and jobs downtown.

1 mentionLast discussed Jun 10, 2026
HighDevelopment

Embassy Project tenant displacement and relocation

Ten occupied commercial tenants and eight residential households face displacement. The Provenza restaurant owners asked for written commitments and financial help; the developer is offering relocation assistance but only three commercial tenants want to return.

9 mentionsLast discussed May 27, 2026
HighTaxes Budget

FY 2026-2027 tax warrant

The tax warrant was adopted, putting this year's budget levy and unpaid sewer rents on residents' tax bills.

1 mentionLast discussed May 18, 2026
HighRoads

Westchester Avenue/Monroe Place intersection safety

Two accidents in as many weeks — including a school bus crash — at the dangerous Monroe/Westchester intersection. The village has pushed for a traffic light for years, but the county owns the road and hasn't budged.

1 mentionLast discussed May 4, 2026
HighTaxes Budget

FY 2026-2027 Village Budget and Tax Levy

The proposed budget raises the tax levy 4.38% — about $1.48 million — which is 2.5% over the state tax cap. That could mean a bigger property tax bill. There's a public hearing April 6 before the board adopts it by May 1.

3 mentionsLast discussed Apr 20, 2026
HighDevelopment

250 Boston Post Road apartment development variances

The former TD Bank site is headed toward 120 apartments, including 10% affordable units, with five stories where zoning allows three. The board found the topography — rock outcroppings and a 40-foot rise toward the school — justified the variances without blasting or neighborhood harm.

1 mentionLast discussed Apr 16, 2026
HighDevelopment

120-unit apartment proposal at 250 Boston Post Road

The developer of the former TD Bank site wants variances to build 120 apartments (10% affordable) with four stories of residential over three stories of parking — two stories over the zoning cap. The case keeps getting pushed while the Planning Commission reviews a revised plan.

3 mentionsLast discussed Apr 16, 2026
HighPublic Safety

Fire Department Capacity and Aging Firehouses

The all-volunteer department is on pace for a record 600+ calls in 2026 and is adapting to 16-story buildings with high-angle rescue training and new equipment. The chief says it's time for a long-term plan to rebuild and expand fire headquarters, which has weekly pipe leaks and a damaged apparatus floor.

1 mentionLast discussed Apr 6, 2026
HighDevelopment

Embassy Project redevelopment of North Main Street

A 250-unit building with ground-floor retail and public parking is moving through review. New renderings show brick detailing, balconies, and a restored historic Embassy sign in the lobby. A public hearing is set for January 26.

2 mentionsLast discussed Mar 30, 2026
HighTaxes Budget

Homestead/Non-Homestead Tax Base Shift

Home values in the Port Chester school district keep climbing even as sales slow — so much so that homestead properties now carry a larger share of the tax levy than non-homestead, an unexpected shift that benefits other taxpayers.

2 mentionsLast discussed Mar 11, 2026
HighDevelopment

Embassy Theater project public parking MOU

The Embassy project will include 125 public parking spaces downtown, with the Village getting a 35% share of parking revenue. The IDA got an early heads-up because the public benefit is large enough to require a special deviation from its usual rules.

2 mentionsLast discussed Mar 11, 2026
HighZoning

Proposed overnight on-street parking ban

Trustees debated banning overnight street parking village-wide, but no decision was made. The board will first review the 2022 Colliers parking study and may form a residents' committee before commissioning a new study that could cost up to $200,000. Residents without driveways, renters, and overnight workers pushed back hard.

5 mentionsLast discussed Mar 2, 2026
HighDevelopment

120-Unit Residential Development at 250 Boston Post Road

The first residential project proposed for the Boston Post Road corridor would put 120 apartments above a three-level parking garage. The applicant trimmed its variance requests from many down to two after months of Planning Commission review, and neighbors' concerns about views and construction noise drove design changes.

1 mentionLast discussed Feb 19, 2026
HighZoning

Legal status of three-family dwelling at 47 Ellendale Avenue

The owners want the ZBA to declare their three-family house a legal pre-existing use, or grant a use variance to keep renting it as three units. Board members signaled they think the owner created his own problem by buying it as a two-family and renting three units anyway — a denial looks likely on February 19, which would mean losing the basement rental income.

2 mentionsLast discussed Feb 19, 2026
HighPublic Safety

Snow removal equipment failures and new snow blower purchase

The village's 1971 Sicard snow plow and a John Deere loader both broke down during January's storms, hampering removal of roughly 1,000 truckloads of snow. The board bought a $255,000 snow blower attachment so crews can throw snow into dump trucks and clear the village's 132 miles of road faster.

1 mentionLast discussed Feb 17, 2026
HighBudget

Tax-Exempt Bond Financing and Commercial Displacement

Planning staff reviewed long-term goals for the LDC, noting that legal restrictions currently limit tax-exempt bond financing for affordable housing. The board plans to focus on commercial displacement mitigation strategies as an initial project.

2 mentionsLast discussed Feb 11, 2026